Lower Lake’s Dam Restoration, Part 6, 2013

November 9th Progress on the Dam RestorationBright and early, Kodiak was on-site to begin the removal of the original vertical spillway pipe. Temporary Lake Spillway InstalledKodiak is about to install the temporary spillway.  With the many springs that feed the lower lake from the ravines on either end of the lake bringing in a constant… More Lower Lake’s Dam Restoration, Part 6, 2013

Lower Lake’s Restoration, Part 5, 2013

November, New Progress, 2013November 5th Kodiak began grinding the stumps on the dam.  Medina County had required that the stumps remain in place over the 2012 winter to hold the clay of the dam.  They also required that the stumps be ground such that only the outer roots would remain for removal.  This photo shows… More Lower Lake’s Restoration, Part 5, 2013