Lower Lake’s Dam Restoration, Part 8, 2013

Inspection of the Emergency Spillway November 18, 2013Medina County Engineers Inspector Metz stands in the emergency spillway for his inspection. This is a close up of the emergency spillway on which the rest of the work for the installation will be done. This photo is of the hooded inlet spillway pipe and its relationship to… More Lower Lake’s Dam Restoration, Part 8, 2013

Lower Lake Restoration, Part 7, 2013

Clearing Muck Dam, November 11, 2013With the basic clay installed, the truck dance could slow to one truck, carrying the muck dam that Kodiak had created to hold back the water of the lake. Kodiak continued to clear the muck, and also pulled out a large log from the water. The view of the shaped… More Lower Lake Restoration, Part 7, 2013