Electric, Communication Conduit Install, 2009

The first set of conduit installed by Precision Directional Boring was the cable, telephone, fiber optics conduits installed between the utility pole at West River Road and the green electrical transformer/switch box near the common drive.  The electric service wire had already been installed to the green transformer/switch box in the south turnaround.  Below is the drilling bit exiting… More Electric, Communication Conduit Install, 2009

Lot 13 Communication Conduits Install, 2009

In April, 2009, following the undergrounding of the utilities by Precision Directional Boring, Kodiak installed the cable/telephone/fiber optics conduits to the Lot 13 property line.  Since Kodiak would have to cross the original gas line installed to a previous purchaser of Lot 13, careful trenching was required.To minimize the impact on the common drive, Kodiak used… More Lot 13 Communication Conduits Install, 2009

Lots 10 & 11 Water Line Install, 2009

This is the dam through which the water lines, hydrant supply line, electric, cable, telephone, fiber optics conduits were directionally bored by Precision Directional Boring in March-April, 2009.  The electric, cable, telephone, fiber optics conduits were bored through the west or left side of this dam and the water and hydrant supply line were bored… More Lots 10 & 11 Water Line Install, 2009