West River Road Driveway Entrance, 2009

A wide entrance is critical to safe ingress/egress to West River Road.  The Medina County Highway Engineers required a 50-foot wide connection from the common drive to West River Road.  Due to the location of a utility pole that had been installed in the driveway easement, the driveway would have a sharper curve entering/exiting south, and… More West River Road Driveway Entrance, 2009

North Turnaround/Privacy Mound, Lot 10

2009 was a year of improvements at Lakeview.  Kodiak Construction, Inc. spearheaded the above-ground work which included installing privacy mounds for Lots 10, 12 and 13; driveways,  and turnaround driveways at both the north and south ends of the common driveway to Lots 10 and 11 which is on the dam to the upper lake.  This October 20, 2008 photo is a view of… More North Turnaround/Privacy Mound, Lot 10