Lots 10 & 11 Water Line Install, 2009
This is the dam through which the water lines, hydrant supply line, electric, cable, telephone, fiber optics conduits were directionally bored by Precision Directional Boring in March-April, 2009. The electric, cable, telephone, fiber optics conduits were bored through the west or left side of this dam and the water and hydrant supply line were bored… More Lots 10 & 11 Water Line Install, 2009