Electric, Communication Conduit Install, 2009
February 28, 2016
The first set of conduit installed by Precision Directional Boring was the cable, telephone, fiber optics conduits installed between the utility pole at West River Road and the green electrical transformer/switch box near the common drive. The electric service wire had already been installed to the green transformer/switch box in the south turnaround. Below is the drilling bit exiting… More Electric, Communication Conduit Install, 2009